Rooftop solar installation over Lagos skyline at golden hour
Lagos, Nigeria · Solar Engineering

End diesel dependency in Lagos. Silent solar power. 24/7.

Premium hybrid inverters, LiFePO4 lithium batteries and turnkey rooftop solar — engineered for Lagos outage patterns and installed by COREN-registered engineers. Free site audit. 10-year warranty. Diesel bills gone.

COREN-registered engineers Same-day Lagos response Insured crews

Why Lagos is switching

Diesel is expensive. Grid is unreliable. Solar solved both.

Rising diesel bills

Generator running costs in Lagos have tripled. Solar + LiFePO4 slashes monthly fuel spend by 70–95%.

Endless grid outages

Ikeja Electric and EKEDC uptime keeps falling. A hybrid solar system runs silently through every outage.

Generator maintenance

No more oil changes, no fumes, no 2am refueling. Our systems are engineered for zero-touch operation.

Lagos-ready packages

Sized for real Lagos loads.

Every package below is engineered around actual outage patterns in Lagos — not nameplate maths. Prices include design, installation, DB integration, monitoring and 10-year warranty.

Home Essential

Best for 2–3 bedroom flats

from ₦2.9M

  • 3 kVA hybrid inverter
  • 5 kWh LiFePO4
  • 1.5 kW PV
  • Fridge, TV, lights, fans, phones
  • 6–8 hrs backup
  • Silent, indoor-safe
Request this package
Most popular

Family Hybrid

Most popular — Lekki / Ajah / Ikeja

from ₦5.4M

  • 5 kVA hybrid inverter
  • 10 kWh LiFePO4
  • 3 kW PV
  • 1 AC + full home loads
  • 12–16 hrs backup
  • Runs through 24/7 outages
Request this package

Estate & SME

Offices, clinics, duplexes

from ₦9.8M

  • 10 kVA hybrid inverter
  • 20 kWh LiFePO4
  • 6 kW PV
  • 3–4 ACs + office equipment
  • Full-day autonomy
  • Diesel-genset changeover
Request this package

How it works

From WhatsApp to installed in a week.

01

Free WhatsApp audit

Send us your last generator receipt and a photo of your DB. We reply with a right-sized quote in under 2 hours.

02

On-site engineering visit

COREN-registered engineer visits your Lagos address, measures loads, roof orientation, and shading.

03

Turnkey installation

Panels, hybrid inverter, LiFePO4 cabinet, DB integration, monitoring — installed in 1–3 days.

04

10-year support

Remote monitoring, on-call service across Lagos mainland and island, and a documented commissioning package.

Engineered for Lagos

A solar system that survives Lagos.

Lagos is unforgiving on power systems. Salt in the air on the island, red-hot ambient temperatures on the mainland, dust from harmattan, and a grid that swings between over-voltage spikes and complete blackouts within the same hour. A solar system that works in Abuja will die in Lagos within two years.

Why our engineering is different

Every Maypatronic installation in Lagos uses IP65-rated hybrid inverters with wide input voltage tolerance (90–280V AC), LiFePO4 batteries rated to 60°C ambient operation, and marine-grade cable glands on all outdoor connections. We spec panels with anti-PID (potential-induced degradation) coating because Lagos humidity destroys cheap panels inside 18 months.

What you actually get

A turnkey installation includes structural roof survey, load audit, single-line diagram signed off by a COREN-registered engineer, DB integration with automatic transfer switching, remote monitoring app, and a documented commissioning package you keep for warranty and insurance claims. Read more on our warranty terms and engineering process.

Solar in Lagos — questions we hear most

How much does a solar system cost in Lagos in 2026?

For a typical 3–4 bedroom Lagos home, a 5 kVA hybrid system with 10 kWh LiFePO4 storage and 3 kW of panels starts around ₦5.4M installed. Larger duplexes or homes with multiple ACs range ₦8M–₦16M. We size every system to your actual load profile, not nameplate maths.

Can solar power run my air conditioners in Lagos?

Yes. Our Family Hybrid (5 kVA) comfortably runs 1 inverter AC + full home loads. Estate & SME (10 kVA) handles 3–4 ACs plus office equipment. We use inverter-class ACs and pair them with LiFePO4 storage sized for Lagos outage patterns.

How long does installation take?

Residential systems on Lagos Island, Lekki, Ikoyi, Ikeja, Ajah, Magodo and surrounding areas take 1–3 days from equipment delivery to commissioning. Commercial installs vary by scope.

Do you install in every part of Lagos?

Yes — mainland and island, including Victoria Island, Ikoyi, Lekki Phase 1 & 2, Ajah, Sangotedo, Ikeja GRA, Magodo, Omole, Yaba, Surulere, Festac, Isolo, Ogba, Berger, and estate communities on the Lagos–Ibadan corridor.

What is LiFePO4 and why does it matter?

Lithium Iron Phosphate (LiFePO4) is the safest and longest-lasting lithium chemistry — 6,000+ cycles, no thermal runaway, and full 10-year warranty. It is the only battery chemistry we install for Lagos residential systems.

Do I get a warranty and support in Lagos?

Yes. 10 years on the LiFePO4 battery, 5 years on the hybrid inverter, 25 years on the panels' power output, and a full 12-month workmanship warranty. Our engineering line is on WhatsApp with a 2-hour response SLA.

Ready to leave diesel behind?

Send your last generator receipt and a photo of your DB on WhatsApp. A senior Lagos engineer replies with a right-sized quote inside 2 hours — no obligation.

Chat on WhatsApp